Did You Know?
Under an existing contract, the U.S.EPA recognized ER for reducing asbestos cell construction costs by $400,000.
ER reviewed and critiqued engineered plans and implemented alternate construction approaches, resulting in cost savings for the client.
|
|
|
Environmental Construction
 |
Repository/Cell Construction
|
|
 |
Cap Installation
|
|
 |
Treatment System Installation
|
|
 |
Temporary Structures
|
|
|
 |
ER has successfully managed and constructed repositories and landfill cells ranging from simple earthen excavated repositories to engineered lined cells requiring monitoring well and lysometer monitoring.
Likewise, ER has placed the full range of caps from 'field engineered' soil caps to complex multiple layer geosynthetic caps including GCL, HDPL and other synthetic membranes.
During hazardous waste removal operations in residential areas, ER routinely uses temporary buildings, including 'Sprung' type structures.
These structures house tipping stations and enclose excavation to help limit emissions, segregate the treatment area and protect the public.
|
|
 |